DA-PU100 Series Administrator's Manual
24
2.6
Operation
Monitor the communication status of installed PLC adaptors.
What to prepare
Installed PLC adaptor
HUB
PC for Operating tool (Monitoring Tool previously installed)
(1) Connect the PC to the same LAN network as the PLC adaptor.
(2) Launch the Monitoring Tool on the PC.
(3) Configure the Monitoring Tool.
If the installed PLC adaptor is not displayed, problems such as slow connection speed occur, so please
follow the troubleshooting procedure.
AC 100-240 V
LAN HUB
Installed PLC Adaptor
PC for Operation tool
Summary of Contents for HD-PLC DA-PU100
Page 1: ...Administrator s Manual PLC Adaptor Model No DA PU100 ...
Page 4: ...DA PU100 Series Administrator s Manual 4 Chapter 1 Introduction ...
Page 9: ...DA PU100 Series Administrator s Manual 9 Chapter 2 Installation and Operation ...
Page 25: ...DA PU100 Series Administrator s Manual 25 Chapter 3 PC Tools ...
Page 32: ...DA PU100 Series Administrator s Manual 32 Chapter 4 Preparation for Operation ...
Page 58: ...DA PU100 Series Administrator s Manual 58 Chapter 5 Troubleshooting ...
Page 62: ...DA PU100 Series Administrator s Manual 62 Chapter 6 Specifications ...
Page 65: ...DA PU100 Series Administrator s Manual 65 7 Dimensions With the fixing brackets attached ...