4.3-3
Additional equipment
Separating screw couplings:
•
Switch off pump
•
Remove pressure from the lines by operating the control levers in both switching positions.
•
Separate
dust
caps
•
Separate screw couplings.
•
Screw on dust caps and stow the hoses properly in the hose boxes.
Multifaster
Plug, guiding bolt and coupling have to be cleaned every time before starting the Multifaster.
Connecting the Multifaster:
•
Switch off the pump
•
Make lines pressure-free by operating the control
lever
Open the protective lid (1) until it locks
Press the safety button (2) and open the tightening lever (3)
1
2
33
Put the plug on the coupling (4)
4
Close the tightening lever (5) until the safety button locks
5
Summary of Contents for PK 23002
Page 1: ......
Page 2: ......
Page 4: ...Inhalt ...
Page 6: ...Inhalt ...
Page 8: ...1 1 1 Overview of dangers ...
Page 16: ...1 3 6 During crane operation ...
Page 18: ...2 1 1 Checks ...
Page 20: ...2 1 1 Checks ...
Page 22: ...3 1 1 An overview of the crane ...
Page 40: ...4 1 1 During crane operation ...
Page 68: ...4 3 6 Additional equipment ...
Page 70: ...5 1 1 Ending crane operation ...
Page 80: ...5 2 1 After crane operation ...
Page 82: ...6 1 1 Maintenance ...
Page 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Page 94: ......