4.1-3
During crane operation
Never exceed the lifting capacities stated on ancillary equipment and load lifting gear. When using
sling ropes, sling chains and lifting straps observe the loading table of the respective manufacturer.
In working with mechanical extensions the permissible lifting capacity
of the extension used determines the maximum permissible lifting
capacity. This must be stated clearly on the side of the respective
extension (see DA 069).
Therefore fasten your load only on the mechanical extension suitable for such or on a hydraulic
extension arm.
Lifting capacity plate for a crane in design C
1 Design indicated (crane of design C) by stamped
triangle
2 Outreach details
3 Versions (load arm variants)
4 Load capacity values
Summary of Contents for PK 23002
Page 1: ......
Page 2: ......
Page 4: ...Inhalt ...
Page 6: ...Inhalt ...
Page 8: ...1 1 1 Overview of dangers ...
Page 16: ...1 3 6 During crane operation ...
Page 18: ...2 1 1 Checks ...
Page 20: ...2 1 1 Checks ...
Page 22: ...3 1 1 An overview of the crane ...
Page 40: ...4 1 1 During crane operation ...
Page 68: ...4 3 6 Additional equipment ...
Page 70: ...5 1 1 Ending crane operation ...
Page 80: ...5 2 1 After crane operation ...
Page 82: ...6 1 1 Maintenance ...
Page 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Page 94: ......