Preparings for crane operation
3.2-2
Working in arm positions beyond 60° (near vertical arm position, rope winch
operation, fly-jib operation)
When working crane position beyond 60° the vehicle has to be completely
levelled. The bubble must be within the inner circle.
When the vehicle is more than 1,5° inclined during loading works in
near vertical position this may cause the load arm swinging to the
side and the load being dropped because of the reduced guiding
function of the hexagon profile of the extendable arms.
Summary of Contents for PK 23002
Page 1: ......
Page 2: ......
Page 4: ...Inhalt ...
Page 6: ...Inhalt ...
Page 8: ...1 1 1 Overview of dangers ...
Page 16: ...1 3 6 During crane operation ...
Page 18: ...2 1 1 Checks ...
Page 20: ...2 1 1 Checks ...
Page 22: ...3 1 1 An overview of the crane ...
Page 40: ...4 1 1 During crane operation ...
Page 68: ...4 3 6 Additional equipment ...
Page 70: ...5 1 1 Ending crane operation ...
Page 80: ...5 2 1 After crane operation ...
Page 82: ...6 1 1 Maintenance ...
Page 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Page 94: ......