5.1-4
Ending crane operation
5.1-4
Manually retractable outriggers
Push in and secure outriggers
Depending on your crane model it may be equipped with snap-on bolts or interlock.
(1) Remove the spring cotters from the snap-on bolts.
(2) Then open the snap-on bolts of the outriggers.
(3) Push the outriggers in to approx. 60cm (3 ft).
(4) Close the snap-on bolts.
(5) Push the outriggers in until the snap-on bolts engage
(6) Secure the snap-on bolts with the spring cotters. On both outriggers
check that the snap-on bolts have engaged by trying to pull the
outriggers out.
If outriggers are not completely retracted and/or not properly
locked with the snap-on bolts, or the snap-on bolts are not
secured with the spring cotters the outriggers may slide out
during transport. This represents danger of fatal injury for you
and other road-users.
Summary of Contents for PK 23002
Page 1: ......
Page 2: ......
Page 4: ...Inhalt ...
Page 6: ...Inhalt ...
Page 8: ...1 1 1 Overview of dangers ...
Page 16: ...1 3 6 During crane operation ...
Page 18: ...2 1 1 Checks ...
Page 20: ...2 1 1 Checks ...
Page 22: ...3 1 1 An overview of the crane ...
Page 40: ...4 1 1 During crane operation ...
Page 68: ...4 3 6 Additional equipment ...
Page 70: ...5 1 1 Ending crane operation ...
Page 80: ...5 2 1 After crane operation ...
Page 82: ...6 1 1 Maintenance ...
Page 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Page 94: ......