6.1-3
Maintenance
6.1-3 Maintenance
schedule
after the first 50 hours
Initial service
14
Oil filter package
W
1
Fastening bolts - support cylinders
10
Hydraulic lines/hoses, retighten screw connections
11
Crane base fastening
13
Slewing cylinder
every 50 hours or after more than 3 months’ service
2
Snap-on bolts, outrigger locking device
3
Crane pillar bearing / Gear rack (360° swivel)
4
Bearing of elevating and arm cylinder
5
Hinge pin bearing
6
Boom bearing
7
Hinged arm bearing
8
Elevating cylinder slideways
9
Extendable arms / mechanical extensions
12
Control levers, shift rods
14
Hydraulic fluid level (unsupported and in transport position)
15
Hook, function control of hook safety flap
16
Rope winch
every 500 hours/at least 1 x every six months
1
Fastening bolts - support cylinders
11
Crane base fastening
13
Slewing cylinder
17
Rope
18
Suspens. gear
every 1000 hours/at least 1 x year
17
Oil filter package - hydraulic fluid
change
6.1-6
16
Rope winch - gear oil
Visual check
Grease
Spray lubricant
Rope grease
Re-tighten bolts
Machine oil
SAE 90
W
change
Summary of Contents for PK 23002
Page 1: ......
Page 2: ......
Page 4: ...Inhalt ...
Page 6: ...Inhalt ...
Page 8: ...1 1 1 Overview of dangers ...
Page 16: ...1 3 6 During crane operation ...
Page 18: ...2 1 1 Checks ...
Page 20: ...2 1 1 Checks ...
Page 22: ...3 1 1 An overview of the crane ...
Page 40: ...4 1 1 During crane operation ...
Page 68: ...4 3 6 Additional equipment ...
Page 70: ...5 1 1 Ending crane operation ...
Page 80: ...5 2 1 After crane operation ...
Page 82: ...6 1 1 Maintenance ...
Page 85: ...Maintenance 6 1 3 5 8 11 12 9 4 6 5 7 16 12 4 13 1 2 3 3 W 10 18 17 11 13 15 ...
Page 94: ......