![OTIS GEN II OI-6000 Operation Manual Download Page 29](http://html1.mh-extra.com/html/otis/gen-ii-oi-6000/gen-ii-oi-6000_operation-manual_1658598029.webp)
INSTALLATION AND STARTUP
OI-6000-X-X-X-X-O OPS_GUIDE_REV 3.1
23
2.3.7
CLOSING THE ENCLOSURE
1.
Place the internal system back into the device enclosure, matching each mounting post to its
corresponding eyelet anchored within the base of the enclosure.
2.
Using the thumbscrews, gently push to seat the internal system into the mounting posts.
NOTICE
The thumbscrews on the OI-6000 function ONLY as thumb-holds for ease in removal of the internal
system from the base of the enclosure. Do NOT attempt to loosen or tighten the thumbscrews when
opening or closing the enclosure.
3.
Verify that the sealing ring, seated at the threaded opening of the device enclosure, is correctly in
place.
4.
Affix the enclosure lid back onto the device, rotating the lid until it is tightly screwed into place.
2.4
SYSTEM START-UP
After the enclosure is closed and power is applied, the unit will start automatically and begin its 1-minute warmup
period. During warmup, the display will show a countdown of the time remaining until the system start-up is complete.
The Otis logo and the unit information will also show on the display screen during start-up.
At the end of the countdown, the device will be in normal operating mode.
Summary of Contents for GEN II OI-6000
Page 1: ......
Page 2: ......
Page 4: ......
Page 28: ...INSTALLATION AND STARTUP 22 OI 6000 X X X X O OPS_GUIDE_REV 3 1...