Section 4: Operation
5376000207
4-9
30 FT
4.2
TILTING THE DECK/UNLOADING
1.
Turn on the body lights and
any work lights, as necessary.
(Switches are located on the
switch panel in the dash).
2. Position the rear of the carrier
allowing significant area to
unload the equipment.
PP
RR
N
N
44
22
11
D
D
3. Place the carrier’s transmission
gear selector into Neutral or
Park and set the parking brakes.
OUT
OUT
PPO
OWER
WER TTAKE-OFF
AKE-OFF
4. Engage the power take-off
(PTO). Refer to PTO operator’s
manual.
NEVER TRAVEL
WITH
THE POWER TAKE OFF
CONTROL ENGAGED. This
could result in damage to the
PTO unit and the recovery
vehicle’s transmission.
BEACON
LIGHT
AUX
WARN
REAR
FLOOD
WORK
LIGHT
MASTER
0N
0N
0N
0N
0N
Summary of Contents for JERR-DAN 20NGADF6T-LP
Page 3: ...Revision Log 5376000207 a REVISION LOG January 13 2020 A Original Issue of Manual...
Page 8: ...Read This First f 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 22: ...Section 1 General Safety Practices 1 12 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 42: ...Section 3 Controls Indicators 3 8 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 106: ...Section VII Specifications 7 6 5376000207 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 107: ...Inspection Maintenance and Repair Log Serial Number Date Comments...
Page 108: ...Inspection Maintenance and Repair Log Date Comments...
Page 110: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 111: ......