SECTION 6: MAINTENANCE
CAS40P 40 CFM / 100 PSIG
PAGE - 32
®
An Oshkosh Corporation Company
KEY
DESCRIPTION
KEY
INSTRUCTION
A
HOUR METER (connection-side)
1
Remove the two (2) wire connectors from
the hour meter.
B
PRESSURE GAUGE (connection-side)
(
B
1
= pressure gauge assembly elbow [ref.])
2
Remove the tubing from the elbow on the
pressure gauge assembly.
C
PRESSURE SWITCH (reference)
Figure 6-2: Disconnections for Removal of Instrumentation-Side Panel
B
1
B
1
C
B
2
1
A
Refer to
Figure 6-2
for steps #2 and #3.
2. Disconnect the two (2) wire connectors from
the hour meter [
A
].
3. Disconnect the tubing from the elbow [
B
1
] on
the pressure gauge assembly [
B
].
4. Remove the three (3) remaining sets of 1/4-20
truss screws [
D
] and 1/4” nylon flat washers
[
E
], as indicated by [
F
] in
Figure 6-1
, to free
the instrument-side panel.
5. Place or lean the instrument-side panel in a
safe place while maintenance is being
performed, taking care not to put any undo
stress on the pressure gauge assembly.
INSTRUMENTATION-SIDE PANEL
REPLACEMENT—
Figure 6-1 [C]
:
1.
Carefully re-set the instrumentation-side panel
into position so that the twelve (12) panel
mounting holes align to the instrumentation-side
mounting holes of the machine.
2. Place a 1/4-20 truss screw [
D
] and 1/4” nylon
flat washer [
E
] each into the three mounting
holes on the right side (facing) of the panel,
Refer to...
Refer to...
WARNING
Before performing maintenance:
Shut down machine, relieve all system
pressure and lock out all power, as per
the Safety Section of this manual. If
machine is hot, allow package to cool
before removing any panel.
NOTE THAT THE SYSTEM CAN BE
STARTED REMOTELY:
Always clearly tag the start-up
instrumentation against accidental
system start-ups during maintenance.
Manual #99905382 Rev 02
(JUNE 2018)
Summary of Contents for IMT CAS40P
Page 119: ...BLANK PAGE...