background image

11

Copyright Orenco Systems

®

, Inc. Property of Orenco Systems

®

, Inc. Do not reproduce or distribute without written authorization from Orenco: 800-348-9843.     •     

AIM-OM-ATX-3, Rev. 2.1, 05/15

AdvanTex

® 

O

&

M

 MANUAL

C O M M E R C I A L   T R E A T M E N T   S Y S T E M S

e.  Measure and compare the dynamic (running) voltage of the pumps 

to the measured static (resting) voltage. Voltage drops indicate 
connection problems in the splice box or wiring that is too small for 
the pump.

f.   Use an ammeter to measure the pump amperage. Make sure 

the amperage is within the range specified in the table below or 
listed on the pump nameplate. For non-Orenco pumps, consult the 
manufacturer’s literature.

  

NOTE:

 

On TCOM panels with a current sensor option, pump 

amperage should match the value listed in the panel. If it does not 
match, inspect the three-position switch on the current sensor for 
the correct scaling factor. 

g.  Set the high and low amperage ranges based on the reading.

Inspection Points (continued)

Pump Amperage Chart

Pump Model

Low Amp  

Reading

High Amp 

Reading

Pump Model

Low Amp  

Reading

High Amp 

Reading

PF100511

11.9

12.6

PF30503200

15.4

18.6

PF100512

6.0

6.4

PF500511

10.5

12.1

PF10053200

3.5

3.9

PF500512

5.4

6.2

PF100552

3.6

3.8

PF500532

2.6

3.0

PF100712

7.8

8.4

PF50053200

3.2

3.7

PF10073200

4.9

5.2

PF500534

1.3

1.5

PF100752

5.8

6.2

PF500552

3.3

3.9

PF101012

9.0

9.8

PF500712

7.3

8.5

PF10103200

5.1

5.6

PF500732

3.1

3.9

PF101552

9.4

11.4

PF50073200

3.9

4.9

PF102012

10.0

12.2

PF500734

1.4

1.8

PF102032

6.4

7.6

PF501012

8.8

10.1

PF10203200

7.5

8.7

PF50103200

4.6

5.7

PF200511

11.0

12.5

PF501034

1.8

2.2

PF200512

5.8

6.5

PF501512

9.6

12.6

PF200532

2.5

2.9

PF50153200

5.4

7.0

PF20053200

3.3

3.8

PF501552

8.0

9.1

PF201012

9.6

10.5

PF503012

12.6

17.7

PF300511

10.7

11.8

PF503032

8

10.4

PF20103200

5.0

5.9

PF50303200

10.1

13.1

PF20153200

6.0

7.2

PF503034

4.2

5.3

PF201512

10.5

12.6

PF505012

17.3

26.4

PF300512

5.6

6.2

PF505032

13.1

16.5

PF30053200

3.3

3.7

PF751512

11.4

12.3

PF300552

3.5

4.2

PF300712

7.4

8.6

P200511

12.6

13.8

PF300752

5.5

6.1

P200512

6.1

7.1

PF30073200

4.1

4.9

P201512

11.2

12.2

PF301012

9.3

10.4

P300512

5.8

6.5

PF301052

6.4

7.4

P300712

7.4

8.3

PF30103200

4.9

5.8

P301012

9.1

10.3

PF301512

10.1

12.6

P500511

11.2

12.7

PF30153200

5.5

6.9

P500512

5.8

6.5

PF301534

2.3

2.8

P50053200

3.4

3.8

PF301552

8.1

9.3

P500712

7.7

8.8

PF302012

7.4

11.0

P50073200

3.8

4.8

PF30203200

7.7

9.3

P501012

9.4

11.2

PF303012

12.6

16.8

P501512

10.6

13.1

PF303032

8.2

10.1

P50153200

6.0

7.6

PF305012

20.1

25.8

PF305032

14.0

16.6

PEF3311

6.9

7.8

Summary of Contents for AdvanTex AX100

Page 1: ...Start Up and Maintenance of AdvanTex AX100 AX20 Commercial Wastewater Treatment Systems AdvanTex O M MANUAL 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco COMMERCIAL MANUAL O M...

Page 2: ...on and treatment is our only job When you purchase an Orenco system you can be confident you have chosen the best equipment available Assistance In addition to providing quality equipment Orenco pride...

Page 3: ...ints Recirculation Blend Tank 13 Inspection Points AdvanTex Filter Pods 13 Inspection Points Vent Fan Assembly 14 Inspection Points Distribution Valve 14 Housekeeping 14 Maintenance Tools Equipment an...

Page 4: ...ion from AdvanTex filtrate returning from the flow splitter basin The harmless nitrogen gas is released freely back into the atmosphere Recirculation Blend Tank The recirculation blend tank reduces th...

Page 5: ...nstallation of all equipment and the availability of power phone line and water at the site The AdvanTex Dealer is expected to be on site and is either performing the start up or acting as a coordinat...

Page 6: ...tion Site drainage Verify that all riser lids external splice box lids and AX pod lids are level and above grade Serviceability Verify that there is a minimum of two feet of space between AX pods Chec...

Page 7: ...control panel to assure proper system operation and component longevity 4 Power supply voltage Make sure the panel breakers are switched off and check the power supply voltage at the panel On 120 V pa...

Page 8: ...er Inspect the riser attachment and rubber grommets for a watertight seal 4 Splice box Inspect the splice box for correct wiring and the use of waterproof splice nuts If there is water in the splice b...

Page 9: ...TCOM control panels d Check the float settings provided in the plans against the actual float settings If the plans don t provide float settings and the engineer or system designer is unable to provi...

Page 10: ...r cam lock fitting and open the discharge assembly ball valve i Switch the pump breaker s in the control panel to the ON position when finished Inspection Points Pumps When the panel has been inspecte...

Page 11: ...3200 3 5 3 9 PF500512 5 4 6 2 PF100552 3 6 3 8 PF500532 2 6 3 0 PF100712 7 8 8 4 PF50053200 3 2 3 7 PF10073200 4 9 5 2 PF500534 1 3 1 5 PF100752 5 8 6 2 PF500552 3 3 3 9 PF101012 9 0 9 8 PF500712 7 3...

Page 12: ...ur system before testing d Lower the float assembly into the tank and clip the float assembly into the float bracket Timed dose a Toggle the AUTO OFF MAN switch to the AUTO position b Record the timer...

Page 13: ...of 9 inches 229 mm from the normal liquid level to the RO float Inspection Points AdvanTex Filter Pods Your system may include AX100 filter pods shown or AX20 filter pods For AX20 inspection points se...

Page 14: ...location of all distribution valves in the system 1 Verify liquid level Make sure that the tank or basin that you are pumping from has sufficient liquid to perform the test WARNING There is no motor...

Page 15: ...r gloves Trash bags Routine Inspection and Maintenance Biotube filter cradle OM BIOTUBECRADLE Beakers or bottles Calculator Channel lock pliers Dissolved oxygen DO meter or colorimetric ampoules 3 16...

Page 16: ...istribute upon request To request multiple copies of this manual contact Orenco Systems Inc at 1 800 348 9843 With preventive maintenance and periodic inspections the wastewater treatment system will...

Page 17: ...r biological growth on the spray nozzles Observe and measure the residual pressure Refer back to the Start up Operation section for initial measurements of residual pressure If the observed residual p...

Page 18: ...E Turn the laterals in the AdvanTex treatment unit 180 degrees so the spray nozzle turbines face up prior to flushing to prevent nozzle clogging while material is being pushed along the lateral to the...

Page 19: ...Recommended Activity Period Activity Visual Inspection of Tank Liquid Levels 1 Check Biotube Effluent Filters Clean as Required 1 Check Biotube Pump Vault Filters Clean as Required 1 Record Elapsed Ti...

Page 20: ...itself Test the automatic function of the system as shown in the Start up Operation section of this manual to verify proper operation c Faulty floats If after checking the circuit breakers fuses and...

Page 21: ...umping downhill A system will not necessarily siphon every time it operates It is dependent on the system design A siphoning system can be retrofitted with an anti siphon valve Most siphoning problems...

Page 22: ...he splice box lid being careful not to drop the screws into the tank If the splice box was submerged or if there is a crack in the conduit there may be water in the splice box If this is the case remo...

Page 23: ...______________________ __________________________________________________ __________________________________________________ __________________________________________________ ________________________...

Page 24: ...________ __________________________________________________ __________________________________________________ __________________________________________________ ______________________________________...

Reviews: