![Oracle Sun Network QDR InfiniBand Gateway Switch Service Manual Download Page 86](http://html1.mh-extra.com/html/oracle/sun-network-qdr-infiniband-gateway-switch/sun-network-qdr-infiniband-gateway-switch_service-manual_1646262086.webp)
78
Sun Network QDR InfiniBand Gateway Switch Service Manual for Firmware Version 2.1 • March 2013
3. Use a No. 2 Phillips screwdriver to remove the four screws that secure the front
of the gateway into the rack.
4. Slide the gateway out of the front of the rack.
5. Set the gateway chassis onto a stable work surface.
Related Information
■
Gateway Installation
, installing the gateway into the rack
■
“Remove a Power Supply” on page 47
■
“Remove a Fan” on page 60
■
“Remove a Data Cable” on page 68
■
“Replace the Battery” on page 78
▼
Replace the Battery
Note –
This procedure assumes that you have removed the Sun Network QDR
InfiniBand Gateway Switch from Oracle from the rack. If not, see
“Remove the
Gateway From the Rack” on page 77
.
1. Identify the prerequisite and subsequent service tasks you must perform in
conjunction with this procedure.
See
“Servicing the Battery” on page 75
.
2. Use a No. 1 Phillips screwdriver to remove the eight screws that secure the
C-shaped brackets at the rear sides of the gateway chassis.