Sun Network QDR InfiniBand Gateway Switch Service Manual for Firmware Version 2.1 • March 2013
6. The cable or transceiver is ready for installation.
See
“Install a Data Cable” on page 72
.
Related Information
■
“Inspect the Power Supply Connectors” on page 45
■
“Inspect the Fan Connector” on page 59
▼
Remove a Data Cable
This procedure describes how to remove the cables from the gateway chassis, so that
the cable can be replaced. If you are removing all cables for gateway replacement,
start removing the cables from the left side of the gateway, working your way to the
right.
Note –
These instructions are valid for both InfiniBand and Ethernet data cables.
1. Identify the prerequisite and subsequent service tasks you must perform in
conjunction with this procedure.
See
“Servicing Data Cables” on page 65
.
2. Loosen the thumbscrews and remove the cover for the cable management
bracket.