![Oracle Sun Network QDR InfiniBand Gateway Switch Service Manual Download Page 54](http://html1.mh-extra.com/html/oracle/sun-network-qdr-infiniband-gateway-switch/sun-network-qdr-infiniband-gateway-switch_service-manual_1646262054.webp)
46
Sun Network QDR InfiniBand Gateway Switch Service Manual for Firmware Version 2.1 • March 2013
3. The power supply is ready for installation.
See
“Install a Power Supply” on page 49
.
Related Information
■
“Inspect the Fan Connector” on page 59
■
“Inspect the Data Cable Connectors or Transceivers” on page 67
▼
Power Off a Power Supply
Note –
Powering off both power supplies powers off the gateway.
1. Identify the prerequisite and subsequent service tasks you must perform in
conjunction with this procedure.
See
“Servicing Power Supplies” on page 41
.
2. Determine which power supply is to be removed.
3. At the front of the gateway chassis, remove the power cord from the respective
power supply.