Verify a Power Supply
Related Information
■
“Remove a Power Supply” on page 78
■
“Verify a Power Supply” on page 82
Verify a Power Supply
1.
Verify that the amber Service Required LED on the replaced power supply is not
lit.
2.
Verify that the PS Fault LED on the front of the server is not lit.
3.
Use the Oracle ILOM
show faulty
command to verify that the fault has been
cleared.
See
“Identify Faulted Components” on page 23
for more information on using the
show faulty
command.
Consider these possibilities.
■
If the previous steps did not clear the fault, see
“Detecting and Managing Faults” on page 21
for information about the tools and methods you can use to diagnose component faults.
■
If the previous steps indicate that no faults have been detected, then the component has been
replaced successfully. No further action is required.
Related Information
■
“Locate a Faulty Power Supply” on page 77
■
“Front Panel Components” on page 11
■
“Rear Panel Components” on page 13
82
SPARC T8-1 Server Service Manual • January 2022
Summary of Contents for SPARC T8-1
Page 1: ...SPARC T8 1 Server Service Manual Part No E80510 04 January 2022 ...
Page 2: ......
Page 10: ...10 SPARC T8 1 Server Service Manual January 2022 ...
Page 20: ...20 SPARC T8 1 Server Service Manual January 2022 ...
Page 58: ...58 SPARC T8 1 Server Service Manual January 2022 ...
Page 106: ...106 SPARC T8 1 Server Service Manual January 2022 ...
Page 112: ...112 SPARC T8 1 Server Service Manual January 2022 ...
Page 128: ...128 SPARC T8 1 Server Service Manual January 2022 ...
Page 146: ...146 SPARC T8 1 Server Service Manual January 2022 ...
Page 152: ...152 SPARC T8 1 Server Service Manual January 2022 ...