Install the Motherboard
c.
Slide the motherboard to the rear of the server to engage the raised
standoffs.
d.
Push the power supplies in to engage securely with the motherboard.
3.
Insert the mid-wall into the chassis (panel 2).
4.
Fasten the mid-wall to the chassis.
a.
Tighten the four green captive screws that secure the mid-wall to the bottom
of the chassis (panel 3).
Servicing the Motherboard
137
Summary of Contents for SPARC T8-1
Page 1: ...SPARC T8 1 Server Service Manual Part No E80510 04 January 2022 ...
Page 2: ......
Page 10: ...10 SPARC T8 1 Server Service Manual January 2022 ...
Page 20: ...20 SPARC T8 1 Server Service Manual January 2022 ...
Page 58: ...58 SPARC T8 1 Server Service Manual January 2022 ...
Page 106: ...106 SPARC T8 1 Server Service Manual January 2022 ...
Page 112: ...112 SPARC T8 1 Server Service Manual January 2022 ...
Page 128: ...128 SPARC T8 1 Server Service Manual January 2022 ...
Page 146: ...146 SPARC T8 1 Server Service Manual January 2022 ...
Page 152: ...152 SPARC T8 1 Server Service Manual January 2022 ...