4-1
C H A P T E R
4
Servicing and Replacing
Components
This chapter includes the service procedures for replacing field-replaceable units and
installing optional assemblies.
This chapter includes the following topics:
■
Section 4.1, “Service Procedures Task Map” on page 4-2
■
Section 4.2, “Identifying Firmware Versions” on page 4-3
■
Section 4.3, “Replacing a Power Supply Unit” on page 4-4
■
Section 4.4, “Powering Down a Link Before Service” on page 4-6
■
Section 4.5, “Preparing the Cable Plate for Service” on page 4-7
■
Section 4.6, “Replacing a Carrier” on page 4-9
■
Section 4.7, “Replacing a Link Cable” on page 4-13
■
Section 4.8, “Replacing a Link Card in the Host Server” on page 4-13
■
Section 4.9, “Replacing a Link Card in an I/O Boat” on page 4-14
■
Section 4.10, “Installing a Second I/O Boat” on page 4-16
■
Section 4.11, “Replacing an I/O Boat” on page 4-19
■
Section 4.12, “Replacing the External I/O Expansion Unit Chassis” on page 4-24
■
Section 4.13, “Powering Up a Link After Service” on page 4-33
Summary of Contents for SPARC Enterprise M4000
Page 4: ......