OPTIMUM
M A S C H I N E N - G E R M A N Y
Assembly
Version 1.0.1 dated 2015-05-27
Page 27
Original operating instructions
TU3008 | TU3008V
GB
3.9
Warming up the machine
CAUTION!
If the lathe and in particular the lathe spindle are immediately operated at maximum load
when cold, this may result in damages.
INFORMATION
For a long service life of your lathe, during the first operating hours, we recommend that you do
not exceed a maximum revolution speed of 500 min
-1
. If the machine is cold, e.g. directly after
having transported the machine, it should be warmed up at a spindle speed of only 500 1/min
for the first 30 minutes.