Please observe the following points:
The device must only be installed and operated in a dry and well-ventilated place.
Avoid places close to machines which cause chips or dust.
The installation site must be vibration-free, i.e. located away from presses, planing
machines, etc.
The substructure must be suitable for the radial drilling machine. Also make sure that the
floor has sufficient load bearing capacity and is level.
The ground must be prepared in a way that potential coolants cannot penetrate the floor.
Any parts sticking out such as stops, handles, etc. have to be secured by measures taken
by the customer if necessary in order to avoid endangering persons.
Provide sufficient space for the personnel preparing and operating the machine and trans-
porting the material.
Also make sure the machine is accessible for setting and maintenance works.
Provide for sufficient backlight (Minimum value: 500 lux, measured at the tool tip). At lower
illumination intensities, additional illumination has to be ensured e.g. by means of a sepa-
rate workplace lamp.
INFORMATION
The mains plug of the radial drilling machine must be freely accessible.
2.6.2 Assembly
WARNING!
Danger of crushing and overturning.
The installation of the radial drilling machine must be performed by at least 2 persons.
WARNING!
The condition of the underground and the fixing type of the machine foot to the
underground must be in a way that it can bear the loads of the radial drilling machine.
WARNING!
First fix the machine so that it stands stable on the substructure before performing any
further installation works or disassembling the transportation locks. The foundation on
which the machine is anchored must have sufficient load bearing capacity. In any case
commission a structural engineer who can check if the place of installation has
sufficient load bearing capacity. Please observe that there is tensile loading and
additional punctual load on the foundation while turning the cantilever against the
direction of the machine foot.
Check the horizontal orientation of the base of the drilling machine with a spirit level.
Check that the foundation has sufficient load-bearing capacity and rigidity.
Place the radial drilling machine on the provided underground.
Align the machine.
Fix the radial drilling machine in the provided through-holes on the machine foot.
2.6.3 Aligning the machine
WARNING!
Risk of toppling the radial drilling machine.
Only undo the clamping lever if the machine is anchored firmly to the base.
Only remove the transport supports if the machine is anchored firmly to the base.
"Transport locking devices“ on page 26
Align the radial drilling machine on the cantilever or on the machine foot by means of a
machine spirit level. The slope deviation of all levels must not exceed 1/1000mm. The more