![Optimum OPTidrill RD 4 Operating Manual Download Page 2](http://html1.mh-extra.com/html/optimum/optidrill-rd-4/optidrill-rd-4_operating-manual_1642860002.webp)
OPTIMUM
M A S C H I N E N - G E R M A N Y
Version 1.0 dated 2017-03-13
Page 2
Translation of the original instructions
RD4
GB
Table of contents
Qualification of personnel .......................................................................................................................10
1.6.1 Target group................................................................................................................................10
1.6.2 Authorized persons .....................................................................................................................11
Safety check ...........................................................................................................................................13
1.10.1 Prohibition, warning and mandatory signs ..................................................................................14
Extendable shift rod ................................................................................................................................14
1.12.1 Main switch..................................................................................................................................15
Using lifting equipment ...........................................................................................................................16
1.17.1 Mechanical maintenance.............................................................................................................17
Delivery, interdepartmental transport, unpacking
Set-up and assembly ..............................................................................................................................22
2.6.1 Installation site requirements.......................................................................................................22
2.6.2 Assembly.....................................................................................................................................23
2.6.3 Aligning the machine ...................................................................................................................23
2.6.4 Fixing...........................................................................................................................................24
Cleaning and lubrication .........................................................................................................................26
2.10.1 Electrical connection ...................................................................................................................27
First commissioning ................................................................................................................................27
2.11.1 Warming up the machine ............................................................................................................28