background image

 

 

Page  

1.3.  Operators and supervisors

 

 
Boiler  operators  must  follow  the  operation  and  maintenance  manual.  Any  interventions  with  the  boilers  that  could  endanger  
the health of the operators or those sharing the household are inadmissible! 
The boilers may only be operated by persons above the age of 18 familiar with the manual and operation of the boiler. 
It is inadmissible to leave children unattended near the boilers in operation. 
When  operating  solid fuel  boilers,  it  is  prohibited to  use combustible  liquids  to  fire  up  as  well  as  to  increase  the  nominal  power 
while the boiler is in operation (overheating). 
No  combustible  articles  may  be  cast  towards  the  stoking  and  ash  pan  openings  and  the  ashes  must  be  put  away  
in non-combustible vessels with lids. 
The boilers in operation must be under frequent supervision of the operators. 
The user may only carry out such repairs that consisting in the plain replacement of a spare part supplied (such as shaped fireclay 
bricks, sealing cords, etc.). 
While operating the boiler, caution must be exercised to ensure tightness of the doors and cleaning holes. These must at all times 
be closed with care! 
The user must not interfere with the structure and electric wiring of the boilers! 
 
The boiler operators must regularly check the water filling level of the heating system and check the pressure meter function. 
In  the  event  of  overheating,  the  operator  must  shut  off  primary  air  supply  and  collect  the  fire  wood  including  the  hot 
charcoal  into  a  non-combustible  vessel.  If  the  water  has  boiled  out  of  the  heating  system,  it  must  not  be  filled  into  
the  boiler  until  after  the  latter  has  cooled  down!  Otherwise  the  boiler  and  the  heating  system  will  be  damaged!  
An overheated boiler and heating system may only  be  recommissioned after all boiler and heating systems have been 
thoroughly checked (this particularly applies to all safety systems). 

 

1.4   Type of environment 

 

The  boilers  may  only  be  used  in  the  basic  “regular  environments"  as  specified  by 

Č

SN  33  0300.  The  boilers  must  be  installed  

in  a  boiler  room  where  access  of  air  required  for  the  combustion  process  is  ensured;  the  boilers  must  be  based  on  a  non-
combustible pad. 
It is prohibited to position the boilers in residential spaces (including corridors)! 

 

Warning: 
In circumstances resulting in the risk of temporary ingress of combustible gases or vapours and while performing works 
that might imply a temporary risk of fire or explosion (e.g. when gluing the lino, PVC, etc.), the boilers must be put out  
of use in time and well in advance. No articles made of combustible materials may be placed on the boilers and within 
smaller than the safe distance away from them! 
 
 

2. 

Use  

 
The ECOMAX series hot water boilers are intended for heating villas or adequate production departments. The boilers must be 
installed in specified working environments only. 
The  boilers  are  supplied  in  basic  design  controlled  by  an  operating  thermostat  only  and  with  electronic  control  which  ensures 
boiler power, control of the circulation pumps and, where relevant, control of the mixing valve. 
The  boiler  must  be  operated  in  line  with  the  requirements  for  the  parameters  of  the  chimney  and  the  heating  system.  
The temperature of water returning to the boiler must not be less than 65°C. We recommend using a mixing valve and a water 
storage tank.   

 
 

3. 

Technical description of the boiler  

 

The  core  of  the  boiler is  the  body  welded  together  out of steel  plates.  In  the  upper  part  of  the  body,  a chute  is  fitted,  equipped  
with a closing stoke door. The lower part of the body is fitted with a circular combustion chamber with a closing ash-pan door. The 
two spaces are mutually separated by a ceramic nozzle. 
An  air  duct  is  provided  in  the  frontal  part  of  the  body,  which  divides  primary  and  secondary  air.  In  the  back  part,  there  is  
an exchange, a flue gas duct, a flue gas removal branch and cleaning holes.  At the very bottom of the boiler body, there is a hole 
of the filling and discharge valves. 
Scanning  sensor  (pressure  sensor,  temperature  sensor  and  safety  sensor)  beds  and  the  hot  water  branch  pipe  issuing  
into the heating system are welded on the top of the boiler body. 
The  boiler  body  is  insulated  with  mineral  felt  and  clad  with  protective  covers.  A  discharge  fan  is  connected  to  the  smoke  duct 
outlet, where the purpose is to remove the flue gases towards the chimney. In the upper part of the boiler body there is a cooling 
loop. 
In the upper part of the flue gas duct, there is a chimney dumper controlled from the frontal part of the boiler. 
Control and display elements contributing to the proper functioning of the boiler are installed on the boiler casing. 
 

Summary of Contents for ECOMAX 25kW

Page 1: ...Page 1 HOT WATER WOOD BOILER ECOMAX 25 35 42kW USER MANUAL 2012 Manufacturer...

Page 2: ...ection to the hot water system 7 7 3 Boiler connection to the smoke duct and chimney 9 7 4 Boiler connection to the power grid 9 8 Operating and maintaining the boiler 10 8 1 General principles 10 8 2...

Page 3: ...ee B C1 and C2 combustibility materials for the degrees of combustibility see the Table The safe distance of 200 mm must be doubled for any boiler and smoke flues located in the vicinity of C3 degree...

Page 4: ...idential spaces including corridors Warning In circumstances resulting in the risk of temporary ingress of combustible gases or vapours and while performing works that might imply a temporary risk of...

Page 5: ...or 3 Chute 12 4 Combustion chamber 5 Chimney dumper 14 15 6 Door screen 7 Hot water branch 8 Cold water branch 9 Door closing 10 Control unit 11 Main switch 12 Safety valve branches 13 Cleaning cap 14...

Page 6: ...wood quality is specified It is recommended to burn lump wood cut in maximum lengths as per the table of technical parameters The wood must be combusted as dry as possible with at least 15 humidity ma...

Page 7: ...stem A gasket must be inserted between the flanges and bolted together using M8x25 bolts A TS 130 safety discharge valve shall be fitted The fixture must be bolted to one of the lateral 3 4 outlets an...

Page 8: ...st be fitted to the hot water outlet from the boiler as close to the outlet pipe as possible Chart showing connection of the boiler to a forced circulation system indicative chart with no claim to com...

Page 9: ...et connection must conform to the applicable SN standards An unprofessional intervention in the electric wiring of the boiler will result in the latter becoming damaged and may lead to fatal injuries...

Page 10: ...e used to change the resolution of the chart and the buttons are used to move across the time axis The chart memory is roughly for 4 hours 8 3 Adding fuel material Additions of the fuel material take...

Page 11: ...ing process in keeping with the required parameters In all modes basic equithermal controlled fan power is controlled based on the required boiler water output temperature As a default we recommend op...

Page 12: ...difficult to control and the standby time in hot reserve is reduced The problem may be solved by installing a draught controller between the boiler and the chimney The draught controller may be order...

Page 13: ...ush supplied as part of the boiler accessories Use a scraper to clean the entire flue duct including the chimney flap Check the tightness of the chimney flap Where necessary adjust the flap position i...

Page 14: ...the fan by the manual switch and wait for the chimney to cool down entirely about 1 hour If the boiler temperature keeps rising and you can still heat the flap flapping a draught controller needs to b...

Page 15: ...r maintains the boiler output temperature in keeping with the user defined fixed temperature value Equithermal The controller must be equipped with an outdoor temperature sensor The controller will ca...

Page 16: ...oller where the former must be fitted with a potential free switching contact for an equithermal design an outdoor temperature sensor must be connected to be positioned on the northern side of the bui...

Page 17: ...e Ecomax control panel The opening in the bottom right hand side corner of the base serves the conducting of the cabling under the boiler s sheet shell L Power supply MS PE N Secondary circuit circula...

Page 18: ...36 72 25 width height depth Supply voltage 24VDC Maximum input power 5VA Protection to EN60529 IP2X Operating temperature up to 60 C Designed to EN60730 1 2 2001 EMC tested to EN 61000 4 2 EN 61000 4...

Page 19: ...expansion vessels have been adhered to Note When notifying a defect the present Warranty Certificate must be submitted at all times and the exact address and the circumstances in which the defect occ...

Page 20: ...plaint proves unjustified i e the defect or leakage of the weldment is not confirmed by the service engineer the lodger of the complaint will be charged with the costs associated with the inspection a...

Page 21: ...01 Vala sk Mezi Bank details Komer n banka a s account no 1608851 0100 Reg no 47674105 VAT no CZ 47674105 Phone Sales Dept 571 675 589 Secretariat 571 611 250 Production 571 675 405 Sourcing 571 675...

Reviews: