8.6  Boiler cleaning and maintenance 

 
The  boiler  should  be  cleaned  at  a  greater  frequency  as  tar  and  ash  deteriorate  heat  transfer,  which  reduces  boiler  efficiency.  
The  ash  from  the chute  shall be  swept  away  through  the  opening  in  the  nozzle  into  the combustion chamber.  Tar  components 
must be removed from the boiler walls by a scraper and also swept into the combustion chamber. 
Make sure the tar does not flow or impurities falling to the air flap. If so, release the flap and scrape the tar. The air flap must be 
easy to open and close. 
 
Notice: 
The primary air flap is an important boiler control element. Therefore, it must be regularly checked and the air duct space must be 
kept clean! The fallen lumps of wood prevent opening the flap and thus make it impossible to achieve the required boiler power. 
At  the same  time,  the  tar  on the  walls of  the  air  duct hinders  reliable closure  of  the air  flap  thereby  bringing  about  uncontrolled 
combustion that may cause boiler overheating! 

 

Sweep  away  the  ash  from  the  combustion  chamber.  If  possible  do  not  remove  the  A-shaped  adapting  piece.  In  the  event  that  
the  shaped  piece  must  be  removed  with  a  view  to  allowing  a  more  thorough  cleaning  of  the  boiler,  or  due  to  the  need  for  
the replacement of the shaped piece, while fitting the shaped piece back into the combustion chamber, it must be moved all the 
way to the back wall of the chamber.  

 

Notice: 
If  the  shaped  piece  does  not  perfectly  abut  to  the  back  wall  of  the  combustion  chamber,  the  hot  flue  gases  pass  through  
from  the  combustion  nozzle  directly  to  the  flue  gas  exchanger,  outside  of  the  post-combustion  chamber.  This  deteriorates  
the  combustion  process  (the  quantity  of  the  flue  gases  does  not  correspond  to  the  guaranteed  values)  and  the  power  and 
efficiency of the boiler drop! 

 

Unscrew  and  remove  the  upper  cleaning  lid  and  clean  the  exchanger  space  using  a  steel  brush  supplied  as  part  of  the  boiler 
accessories. Use a scraper to clean the entire flue duct including the chimney flap. 
Check  the  tightness  of  the  chimney  flap.  Where  necessary  adjust  the  flap  position  in  such  a  way  so  that  it  may  abut  evenly  
to the vent from the boiler chute. 
Check or remove the gaskets of the cleaning lids and screw them back on. 
 
Check  the  gaskets  of  the  filling  and  ash  pan  doors  and  where  necessary  replace  them.  Check  the  tightness  of  the  doors  
at closure. If either door is not tight, adjust. Treat the hinges and caps regularly with graphite grease
 
Perform  a  visual  check  of  all  mechanic  parts  of  the  boiler  including  the  ceramic  shaped  pieces  and  where  necessary,  replace 
them.  We  recommend  trusting  the  replacement  of  any  damaged  parts  of  the  boiler  including  the  combustion  nozzle  
to a professional service company. 
 
The condition of the heating system must be checked at least once a week (tightness, quantity of water, condition of circulation 
pumps, and or the eventuality of system freezing). 

 

Notice: 
In the course of the cleaning procedure, the ceramic shaped piece must be handled with care. Careless treatment and/or 
a fall from a height will cause damage and will require a replacement.  

 
 

8.7  Overview of possible defects 
 

Description of malfunction 

Probably cause 

Removal method 

Fuel material with humidity above 15 % 

Use firewood at maximum humidity  
of 15 % 

Large and short lumps of wood (average 
above 150mm and length shorter by over 
200mm compared to the chute depth). 

Use wood lumps of correct dimensions 

Primary air flap off. 

Clean and release the flap. 

Flap not fully closed. 

Check the flap tightness, clean the flap, 
check the condition of the return spring 
and position of the flap draw bar. Replace 
if necessary. 

Nozzle clogged. 

Clean and remove any articles fallen 
through to the nozzle slot, or into the 
suction holes. 

The boiler burns poorly, exhibiting a 
low power; the flame in the 
combustion chamber is dull and 
yellowish. 
Excessive firewood consumption.
 

Nozzle damage. 

Replace the nozzle. 
We recommend trusting the job to a 
specialised service company!
 

Summary of Contents for ECOMAX 25kW

Page 1: ...Page 1 HOT WATER WOOD BOILER ECOMAX 25 35 42kW USER MANUAL 2012 Manufacturer...

Page 2: ...ection to the hot water system 7 7 3 Boiler connection to the smoke duct and chimney 9 7 4 Boiler connection to the power grid 9 8 Operating and maintaining the boiler 10 8 1 General principles 10 8 2...

Page 3: ...ee B C1 and C2 combustibility materials for the degrees of combustibility see the Table The safe distance of 200 mm must be doubled for any boiler and smoke flues located in the vicinity of C3 degree...

Page 4: ...idential spaces including corridors Warning In circumstances resulting in the risk of temporary ingress of combustible gases or vapours and while performing works that might imply a temporary risk of...

Page 5: ...or 3 Chute 12 4 Combustion chamber 5 Chimney dumper 14 15 6 Door screen 7 Hot water branch 8 Cold water branch 9 Door closing 10 Control unit 11 Main switch 12 Safety valve branches 13 Cleaning cap 14...

Page 6: ...wood quality is specified It is recommended to burn lump wood cut in maximum lengths as per the table of technical parameters The wood must be combusted as dry as possible with at least 15 humidity ma...

Page 7: ...stem A gasket must be inserted between the flanges and bolted together using M8x25 bolts A TS 130 safety discharge valve shall be fitted The fixture must be bolted to one of the lateral 3 4 outlets an...

Page 8: ...st be fitted to the hot water outlet from the boiler as close to the outlet pipe as possible Chart showing connection of the boiler to a forced circulation system indicative chart with no claim to com...

Page 9: ...et connection must conform to the applicable SN standards An unprofessional intervention in the electric wiring of the boiler will result in the latter becoming damaged and may lead to fatal injuries...

Page 10: ...e used to change the resolution of the chart and the buttons are used to move across the time axis The chart memory is roughly for 4 hours 8 3 Adding fuel material Additions of the fuel material take...

Page 11: ...ing process in keeping with the required parameters In all modes basic equithermal controlled fan power is controlled based on the required boiler water output temperature As a default we recommend op...

Page 12: ...difficult to control and the standby time in hot reserve is reduced The problem may be solved by installing a draught controller between the boiler and the chimney The draught controller may be order...

Page 13: ...ush supplied as part of the boiler accessories Use a scraper to clean the entire flue duct including the chimney flap Check the tightness of the chimney flap Where necessary adjust the flap position i...

Page 14: ...the fan by the manual switch and wait for the chimney to cool down entirely about 1 hour If the boiler temperature keeps rising and you can still heat the flap flapping a draught controller needs to b...

Page 15: ...r maintains the boiler output temperature in keeping with the user defined fixed temperature value Equithermal The controller must be equipped with an outdoor temperature sensor The controller will ca...

Page 16: ...oller where the former must be fitted with a potential free switching contact for an equithermal design an outdoor temperature sensor must be connected to be positioned on the northern side of the bui...

Page 17: ...e Ecomax control panel The opening in the bottom right hand side corner of the base serves the conducting of the cabling under the boiler s sheet shell L Power supply MS PE N Secondary circuit circula...

Page 18: ...36 72 25 width height depth Supply voltage 24VDC Maximum input power 5VA Protection to EN60529 IP2X Operating temperature up to 60 C Designed to EN60730 1 2 2001 EMC tested to EN 61000 4 2 EN 61000 4...

Page 19: ...expansion vessels have been adhered to Note When notifying a defect the present Warranty Certificate must be submitted at all times and the exact address and the circumstances in which the defect occ...

Page 20: ...plaint proves unjustified i e the defect or leakage of the weldment is not confirmed by the service engineer the lodger of the complaint will be charged with the costs associated with the inspection a...

Page 21: ...01 Vala sk Mezi Bank details Komer n banka a s account no 1608851 0100 Reg no 47674105 VAT no CZ 47674105 Phone Sales Dept 571 675 589 Secretariat 571 611 250 Production 571 675 405 Sourcing 571 675...

Reviews: