Opop ECOMAX 25kW User Manual Download Page 12

 

 

Page  

12 

Operating statuses of the boiler in automatic mode 

 

1)  Firing up – With insufficient heating water temperature the circulation pump is switched off. The fan slowly increases 

its  power  until  the  heating  water  temperature  exceeds  the  condensation  temperature.  Then  it  passes  
into the operation stage  

2)  Operation  –  The  boiler  power  is  modulated  in  such  a  way  as  to  ensure  the  boiler  output  water  temperature  is  

as close to the required temperature as possible. The circulation pump is on and hot water is supplied to the heating 
system.  

3)  Inhibition – With the heating water temperature decreasing under the condensation temperature, the boiler switches 

off  the  circulation  pump  and  fan.  The  controller  will  wait  for  the  operator  to  stoke  some  more  fuel  material.  
After the boiler door is opened, firewood stoked and the boiler door closed the controller goes back to the firing up 
stage. 

 

 

Inhibition 

 
For all configurations, a remote spatial thermostat with a switching contact may be connected to the controller.  
(Not heated up – contact closed, heated up – contact open). Once the boiler heats the given room up and switches the spatial 
thermostat open, the boiler will pass to inhibition shutting down the circulation pump.  
 
Caution! The thermostat constant must be separated, potential free. The thermostat must not switch other voltages, and under no 
circumstances must it switch 230VAC network voltage. Otherwise, controller damage is imminent.  

 
 
 
 
8.5  Operation adjustment 

   
Adjusting the operating draught of the boiler  
     
The  boiler  has  been  adjusted  to  the  specified  chimney  draught  at  the  production  plant  (depending  on  the  type  of  the  boiler,  
20-25 Pa – see the Technical parameters of boilers). The size and mass of the primary air flap shutting off air supply to the boiler 
thus regulating the combustion corresponds to this.  
In the event the chimney exhibits a higher than specified draught, a greater consumption of primary air and, by inference, a more 
rapid fuel material loss will occur causing the boiler efficiency to drop. The boiler is also more difficult to control and the standby 
time in “hot reserve” is reduced. The problem may be solved by installing a draught controller between the boiler and the chimney. 
The draught controller may be ordered as special boiler accessories. 
 
No  other  ways  of  adjusting  the  boiler  are  admissible  and  where  necessary,  the  above  may  only  be  carried  out  
by an authorised professional. 
 
In the event that the chimney does not reach the specified draught, the boiler may not achieve the required power either, which 
may either impair the combustion process or even lead to the boiler releasing the smoke into the space (especially whilst stoking). 
The problem needs be addressed by adjusting the chimney following agreement with a professional chimney company. 

 
 

Adjusting the stoking and ash pan door 
 
The  rough  adjustment  of  the  door  is  completed  at  the  production  plant.  Any  changes  that  may  develop  in  transport  must  be 
removed by the boiler operator prior to commissioning the same. Similarly, adjusting the door with the boiler in operation (such as 
in  the  event  of  combustion  smoke  penetrating  into  the  room  with  the  door  closed  or  due  to  the  wearing  or  the  need  f 
or  replacement  of  the  sealing  cord)  belong  to  the  fundamental  maintenance  interventions  on  the  boiler  carried  out  
by the operators. 
The actual adjustment shall be completed after releasing the M12 nuts with a pipe wrench to be inserted in the holes in the side 
encasing (on the hinge side). That will release the sliding hinge of the door.  
Slightly  open  the  door  and  press  on  it  at  the  hinge  locations  to  reduce  the  gap  between  the  sealing  cord  and  the  boiler  frame.  
An appropriately adjusted door must have the same hinge gap over the entire length of the sealing edge; once the door is closed, 
the sealing edge must abut across the entire surface of the frame and it must be possible to freely place the hook of the screwed 
cap into the grip at the door frame. 
After this adjustment has been done, re-tighten the M12 nuts of the sliding hinge with a pipe wrench. 
 
Notice: 
Never retighten the door with force; otherwise the screwed cap could be damaged and the sealing cord cut through! 
If possible, position the boiler in such a way as to ensure easy access to the holes in the side plates. 

 
 

Summary of Contents for ECOMAX 25kW

Page 1: ...Page 1 HOT WATER WOOD BOILER ECOMAX 25 35 42kW USER MANUAL 2012 Manufacturer...

Page 2: ...ection to the hot water system 7 7 3 Boiler connection to the smoke duct and chimney 9 7 4 Boiler connection to the power grid 9 8 Operating and maintaining the boiler 10 8 1 General principles 10 8 2...

Page 3: ...ee B C1 and C2 combustibility materials for the degrees of combustibility see the Table The safe distance of 200 mm must be doubled for any boiler and smoke flues located in the vicinity of C3 degree...

Page 4: ...idential spaces including corridors Warning In circumstances resulting in the risk of temporary ingress of combustible gases or vapours and while performing works that might imply a temporary risk of...

Page 5: ...or 3 Chute 12 4 Combustion chamber 5 Chimney dumper 14 15 6 Door screen 7 Hot water branch 8 Cold water branch 9 Door closing 10 Control unit 11 Main switch 12 Safety valve branches 13 Cleaning cap 14...

Page 6: ...wood quality is specified It is recommended to burn lump wood cut in maximum lengths as per the table of technical parameters The wood must be combusted as dry as possible with at least 15 humidity ma...

Page 7: ...stem A gasket must be inserted between the flanges and bolted together using M8x25 bolts A TS 130 safety discharge valve shall be fitted The fixture must be bolted to one of the lateral 3 4 outlets an...

Page 8: ...st be fitted to the hot water outlet from the boiler as close to the outlet pipe as possible Chart showing connection of the boiler to a forced circulation system indicative chart with no claim to com...

Page 9: ...et connection must conform to the applicable SN standards An unprofessional intervention in the electric wiring of the boiler will result in the latter becoming damaged and may lead to fatal injuries...

Page 10: ...e used to change the resolution of the chart and the buttons are used to move across the time axis The chart memory is roughly for 4 hours 8 3 Adding fuel material Additions of the fuel material take...

Page 11: ...ing process in keeping with the required parameters In all modes basic equithermal controlled fan power is controlled based on the required boiler water output temperature As a default we recommend op...

Page 12: ...difficult to control and the standby time in hot reserve is reduced The problem may be solved by installing a draught controller between the boiler and the chimney The draught controller may be order...

Page 13: ...ush supplied as part of the boiler accessories Use a scraper to clean the entire flue duct including the chimney flap Check the tightness of the chimney flap Where necessary adjust the flap position i...

Page 14: ...the fan by the manual switch and wait for the chimney to cool down entirely about 1 hour If the boiler temperature keeps rising and you can still heat the flap flapping a draught controller needs to b...

Page 15: ...r maintains the boiler output temperature in keeping with the user defined fixed temperature value Equithermal The controller must be equipped with an outdoor temperature sensor The controller will ca...

Page 16: ...oller where the former must be fitted with a potential free switching contact for an equithermal design an outdoor temperature sensor must be connected to be positioned on the northern side of the bui...

Page 17: ...e Ecomax control panel The opening in the bottom right hand side corner of the base serves the conducting of the cabling under the boiler s sheet shell L Power supply MS PE N Secondary circuit circula...

Page 18: ...36 72 25 width height depth Supply voltage 24VDC Maximum input power 5VA Protection to EN60529 IP2X Operating temperature up to 60 C Designed to EN60730 1 2 2001 EMC tested to EN 61000 4 2 EN 61000 4...

Page 19: ...expansion vessels have been adhered to Note When notifying a defect the present Warranty Certificate must be submitted at all times and the exact address and the circumstances in which the defect occ...

Page 20: ...plaint proves unjustified i e the defect or leakage of the weldment is not confirmed by the service engineer the lodger of the complaint will be charged with the costs associated with the inspection a...

Page 21: ...01 Vala sk Mezi Bank details Komer n banka a s account no 1608851 0100 Reg no 47674105 VAT no CZ 47674105 Phone Sales Dept 571 675 589 Secretariat 571 611 250 Production 571 675 405 Sourcing 571 675...