the  connection  of  the  flat  patching  cable  between  the  input/output  module  and  the  Ecomax  control  panel.  Connect  the  power 
cable of the input/output module to the 230VAC distribution grid. 
 
Physically check the running of the primary air circulation pump and the secondary heating circuit pump if present in the heating 
system. Check the running of the flue gas extraction fan. Once the boiler door is opened, the fan must ramp up to 100 % of its 
power.  Draught  must  be apparent  near  the  boiler  door  towards  the chimney.  Once  the  control  button  with  the  image  of  the  fan 
crossed out is pressed, the flue gas extraction fan must stop. No draught should be felt near the boiler door then.  
 
Stack  the  boiler  with  dry  wood  and  fire  it  up  –  see  chapter  8.3  Adding  firewood.  Once  the  fire  has  lit  up  reasonably,  close  
the boiler door and unblock the fan function by repeatedly pressing the button showing the symbol of the crossed-out fan. The fan 
will slowly start to ramp its power up, fanning up the flames in the boiler’s fire chamber. 
 
The boiler’s primary heating circuit pump and the flue gas extraction motor must be electrically interconnected at the customer’s 
site.  The  interconnection  may  only  be  carried  out  by  a  person  with  the  relevant  electric  engineering  qualification.  Space 
thermostat may be individually connected to the controller, where the former must be fitted with a potential-free switching contact; 
for an equithermal design an outdoor temperature sensor must be connected, to be positioned on the northern side of the building 
not  exposed  to direct sunlight,  at  the  height  of  approx.  2  m  above  the  ground.  The  length  of  the patching  cable  for  the  outdoor 
temperature sensor may be 15 m maximum, or 25 m maximum, for connection using a coaxial cable. 
Equipotential bonding must be provided on all electrically conductive parts.  
 
 

10     Electric wiring 

 
The controller is powered by the 230V/50Hz network using a network cable with a bent plug and a CEE7/7 connector. The IEC 
320 C13 network socket case accommodates a protective 2A/T tube fuse. The power part of the controller is screwed on inside 
the sheet cover of the boiler, equipped with bushings and a flat patching cable for the Ecomax control panel. 
 
 

10.1   Conducting the patching cables 
 

Fix the input/output module to the boiler shell in such a way using two installation screws in such a way as to ensure the passage 
holes through the sheet casing of the boiler and module are in alignment. Non-combustible silicon cables under the boiler shell 
will be conducted via this opening. This concerns the main switch, the grounding wire for the equipotential bonding, boiler door 
contact, emergency thermostat and the boiler output water temperature sensor. 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

L 

 

MS 

 

P
E

 

N 

 

P
E

 

N 

 

MC 

 

P
E
 

N 

 

K

P 

K

P

 

T1

 

 

T1

 

 

M

V 

P
E

 

N 

 

G 

 

TS

 

 

G 

 

T
A

 

G 

 

 

 

G 

 

U

T

  

Main switch 

Door contact 

Emergency thermostat 

Boiler output waster 

temperature sensor  

Summary of Contents for ECOMAX 25kW

Page 1: ...Page 1 HOT WATER WOOD BOILER ECOMAX 25 35 42kW USER MANUAL 2012 Manufacturer...

Page 2: ...ection to the hot water system 7 7 3 Boiler connection to the smoke duct and chimney 9 7 4 Boiler connection to the power grid 9 8 Operating and maintaining the boiler 10 8 1 General principles 10 8 2...

Page 3: ...ee B C1 and C2 combustibility materials for the degrees of combustibility see the Table The safe distance of 200 mm must be doubled for any boiler and smoke flues located in the vicinity of C3 degree...

Page 4: ...idential spaces including corridors Warning In circumstances resulting in the risk of temporary ingress of combustible gases or vapours and while performing works that might imply a temporary risk of...

Page 5: ...or 3 Chute 12 4 Combustion chamber 5 Chimney dumper 14 15 6 Door screen 7 Hot water branch 8 Cold water branch 9 Door closing 10 Control unit 11 Main switch 12 Safety valve branches 13 Cleaning cap 14...

Page 6: ...wood quality is specified It is recommended to burn lump wood cut in maximum lengths as per the table of technical parameters The wood must be combusted as dry as possible with at least 15 humidity ma...

Page 7: ...stem A gasket must be inserted between the flanges and bolted together using M8x25 bolts A TS 130 safety discharge valve shall be fitted The fixture must be bolted to one of the lateral 3 4 outlets an...

Page 8: ...st be fitted to the hot water outlet from the boiler as close to the outlet pipe as possible Chart showing connection of the boiler to a forced circulation system indicative chart with no claim to com...

Page 9: ...et connection must conform to the applicable SN standards An unprofessional intervention in the electric wiring of the boiler will result in the latter becoming damaged and may lead to fatal injuries...

Page 10: ...e used to change the resolution of the chart and the buttons are used to move across the time axis The chart memory is roughly for 4 hours 8 3 Adding fuel material Additions of the fuel material take...

Page 11: ...ing process in keeping with the required parameters In all modes basic equithermal controlled fan power is controlled based on the required boiler water output temperature As a default we recommend op...

Page 12: ...difficult to control and the standby time in hot reserve is reduced The problem may be solved by installing a draught controller between the boiler and the chimney The draught controller may be order...

Page 13: ...ush supplied as part of the boiler accessories Use a scraper to clean the entire flue duct including the chimney flap Check the tightness of the chimney flap Where necessary adjust the flap position i...

Page 14: ...the fan by the manual switch and wait for the chimney to cool down entirely about 1 hour If the boiler temperature keeps rising and you can still heat the flap flapping a draught controller needs to b...

Page 15: ...r maintains the boiler output temperature in keeping with the user defined fixed temperature value Equithermal The controller must be equipped with an outdoor temperature sensor The controller will ca...

Page 16: ...oller where the former must be fitted with a potential free switching contact for an equithermal design an outdoor temperature sensor must be connected to be positioned on the northern side of the bui...

Page 17: ...e Ecomax control panel The opening in the bottom right hand side corner of the base serves the conducting of the cabling under the boiler s sheet shell L Power supply MS PE N Secondary circuit circula...

Page 18: ...36 72 25 width height depth Supply voltage 24VDC Maximum input power 5VA Protection to EN60529 IP2X Operating temperature up to 60 C Designed to EN60730 1 2 2001 EMC tested to EN 61000 4 2 EN 61000 4...

Page 19: ...expansion vessels have been adhered to Note When notifying a defect the present Warranty Certificate must be submitted at all times and the exact address and the circumstances in which the defect occ...

Page 20: ...plaint proves unjustified i e the defect or leakage of the weldment is not confirmed by the service engineer the lodger of the complaint will be charged with the costs associated with the inspection a...

Page 21: ...01 Vala sk Mezi Bank details Komer n banka a s account no 1608851 0100 Reg no 47674105 VAT no CZ 47674105 Phone Sales Dept 571 675 589 Secretariat 571 611 250 Production 571 675 405 Sourcing 571 675...

Reviews: