3 - 12
Wiring and Settings
CompoNet Gateway Unit for CC-Link Operation Manual
3-
6-
2
Wir
ing
t
h
e
Co
n
n
e
c
to
r
3
3-6-2 Wiring the Connector
Strip the wires in the CC-Link cable, attach ferrules, and insert them into the connector.
To insert a ferrule, hold the orange tab in and insert the ferrule all the way to the back of the connector.
Then release the orange tab and pull lightly on the wire to confirm that the wire is securely connected.
The communications connector is labeled with the terminal names. Align the colors of the
communications wires with the terminal names on the connector to ensure that the wires are connected
correctly.
*1
Insert terminating resistance at the last station.
*2
The SLD and FG terminals are connected inside the Unit.
Precautions for Correct Use
If the Gateway Unit is at the end of the CC-Link network, be sure to connect the terminating resis-
tance.
Refer to documentation on the CC-Link Master Unit for information on connecting the terminating
resistance.
Terminal
name
Signal
Signal line
color
DA
Signal line
Blue*1
DB
Signal line
White
DG
Communications ground
Yellow
SLD*2
Communications cable
shield
—
FG*2
Frame ground
—
Summary of Contents for GQ-CRM21
Page 1: ...OPERATION MANUAL Cat No W489 E1 01 GQ CRM21 CompoNet Gateway Unit for CC Link ...
Page 21: ...1 Overview 1 1 Overview 1 1 ...
Page 25: ...2 Description of Gateway Unit 2 1 Specifications 2 1 2 2 Component Names and Functions 2 4 ...
Page 38: ...2 13 CompoNet Gateway Unit for CC Link Operation Manual 2 2 Component Names and Functions 2 ...
Page 102: ......