3 - 1
CompoNet Gateway Unit for CC-Link Operation Manual
3
-1 Over
view
o
f O
per
at
ing
Pr
oced
ur
es
3
3-1 Overview of Operating Procedures
3-1-1 Basic Startup Procedures
The basic steps required to use the Gateway Unit are given below.
Network Wiring and Power Supply Wiring
• Use the special CC-Link cables.
• Use compliant cables for CompoNet.
▼
Use the station number switch in the CC-Link communications section to set the station number of
the Gateway Unit on the CC-Link network.
▼
Use pins 1 to 3 on the baud rate DIP switch in the CC-Link communications section to set the baud
rate of the CC-Link network.
Set the baud rate of the Gateway Unit to the same value as the CC-Link Master Unit.
Use pin 1 (DR0) and pin 2 (DR1) on the CompoNet DIP switch to set the baud rate of the CompoNet
network.
▼
Select the communications mode based on the system response speed and number of CompoNet
Slave Units that are connected.
▼
▼
The CompoNet system will start and the number of CompoNet Slave Units that are connected will
be displayed on the seven-segment display on the Gateway Unit.
If pin 3 (DCN) on the CompoNet DIP switch is turned ON, detailed connection information will be
displayed.
▼
1) Mounting and Wiring
Refer to 3-2 to 3-6
2) Setting the Station Number
Refer to 2-2-2
3) Setting the Network Baud Rate
Refer to 2-2-2
4) Setting the Communications Mode
Refer to 2-2-2
5) Setting the Node Addresses of the CompoNet Slave Units
6) Power Application
Summary of Contents for GQ-CRM21
Page 1: ...OPERATION MANUAL Cat No W489 E1 01 GQ CRM21 CompoNet Gateway Unit for CC Link ...
Page 21: ...1 Overview 1 1 Overview 1 1 ...
Page 25: ...2 Description of Gateway Unit 2 1 Specifications 2 1 2 2 Component Names and Functions 2 4 ...
Page 38: ...2 13 CompoNet Gateway Unit for CC Link Operation Manual 2 2 Component Names and Functions 2 ...
Page 102: ......