7
Overview of System Startup Procedure
Section 2-1
• Connecting the Power Cable
Align the polarizing key, insert the connector of the power cable into the
power connector on the Slave Unit, and then tighten the lock nut. The
Slave Unit requires a 24-VDC power supply.
Note
Do not turn ON the power to the Slave Unit yet.
• Rotary Switches
The relationship between the rotary switches on the Slave Unit and the IP
address is shown below.
• Slave Default Settings
The default settings are as follows:
• Rotary switches: 00
• IP address: BOOTP
Rotary switches
IP address
00
BOOTP/software setting
01 to FE
192.168.250.n (n = 01 to FE hex: Rotary switch setting)
FF
Restores the default setting.
(To restore the default setting, set the switches to FF hex,
cycle the power supply, and then set the switches to 00 hex.)
Summary of Contents for ERT1 Series
Page 1: ...OPERATION MANUAL Cat No W481 E1 02 EtherNet IP Slave Units ERT1 Series...
Page 2: ......
Page 3: ...ERT1 Series EtherNet IP Slave Units Operation Manual Revised November 2010...
Page 4: ...iv...
Page 6: ...vi...
Page 8: ...viii...
Page 14: ...xiv...
Page 58: ...38 Recommended Network Devices Section 2 2...
Page 62: ...42 Basic Specifications of Slave Units Section 3 1...
Page 78: ...58 Screw less Clamp Terminals Section 4 2...
Page 92: ...72 Environment resistive Slave Units Section 5 2...
Page 102: ...82 Maintenance and Replacement Section 7 3...
Page 106: ...86 Revision History...
Page 107: ......