OMNI 4000/7000 Operations and Maintenance Guide
– Rev F
3-39
OMNICONNECT® Operations
6.
Fill in the information as required and
choose a product for that batch from the
Product
drop-down list.
If you need to make changes to your list
of products, go to Section 3.4.3 Products
Configuration.
7.
a. Double-click on another row to edit a
different batch in the sequence,
as needed.
b. Right-click on a row to edit, insert or
delete that batch from the sequence.
8.
a. To automatically change batches in a
sequence from one product to
another within a single Meter Run or
Station, assign the applicable
products to the different batches as
you move down the sequence.
b. To manually end a batch and change
the batch to a different product, go to
Manual Batch End in Section 3.6.4
for instructions.
9.
When you are finished, click
Apply
to
save your changes.
When this stack entry becomes the
running product, its meter factors,
measurement selections and setup
selections as they are currently
configured become active.