Figure 259
Shutdown Checklist
The following checklist is a quick reference to ensure equipment shutdown tasks are
completed in the required sequence. Detailed instructions are located in
Position the nozzle for shutdown
Remove the abrasive feed tube from the nozzle
Run test nozzle to clear the nozzle
Close MAKE
Turn OFF the laptop
Turn OFF the ProtoMAX
Clean the machine
Turn OFF the water supply
Turn OFF the breaker power switch, if needed
Shutdown the ProtoMAX
Summary of Contents for ProtoMax
Page 45: ......