Operate the ProtoMAX
system for additional information on
using LAYOUT and MAKE software.
Startup Checklist
The following checklist is a quick reference to ensure equipment startup tasks are
completed in the required sequence. Detailed instructions are located in
Turn ON the laptop (do not open the MAKE application)
Connect the USB cable to the laptop
Turn ON the main power; verify the light comes on
Turn ON the water supply
Check the water pressure
Open the MAKE application
Home the machine
Conduct a nozzle test without abrasive
Fill the hopper with garnet abrasive
Conduct a nozzle test with abrasive
Verify the garnet abrasive is flowing from the hopper to the nozzle
Inspect the visible high-pressure plumbing connections for leaks
Open and configure a kerf check sample file or the part to cut
Load and secure the material on the cutting stage
Set the nozzle stand-off
Position the nozzle at path start point
Perform a dry run
Fold down the splash guard cup
Add water to raise the water level above the material surface, adjust the drain height if
needed
Begin machining the part
Check the cutting water pressure
Adjust the tool offset if needed
NOTE:
A kerf check is performed only to verify mixing tube wear and to adjust the tool offset if
needed.
Start the ProtoMAX
Summary of Contents for ProtoMax
Page 45: ......