56.
Attach
Facia Nailing strips
(3/4” x 2 1/2” x 51”) to the underside edge of
Roof Battens
with
4 - 1 1/4”
screws per piece.
Nailing Strip
will make it easier to attach Front and Rear Facia
in
Step 71.
Complete front and rear strips (4 pieces total).
54.
Locate remaining
Foam Enclosures
. Place Foam Enclosures near the apex of roof pan-
els. Foam Enclosures prevent moisture from coming in through the top of your shed.
55.
Place 3
Metal Ridge Caps
onto apex of roof. Evenly space from to back of your
shed.Ridge Caps will overlap each other. Overhang the Ridge Caps approximately 1” - 2” past
each end. When Metal Ridge Caps are positioned, secure with
16 - 2” Metal Roof Screws
(8
per side). Screw into center of final Batten. Screws are self-tapping, Do not overtighten!.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 31