21.
Attach
Short
Door Headers
to Narrow Walls with
2 - 2 1/2” Screws
per
piece. Header is 3 1/2” wide at bottom and has a 1/2” thick x 3” wide strip of
wood stapled to the top creating a notch or dado effect. This notch needs to be
positioned on the top facing the front. The notch is necessary to hold the drip
cap that will be installed above the door in
Step 56
.
Pre-drill to prevent splitting!
Parts
Door Headers - Short
(2” x 3 3/8” x 6 1/2”)
x 2
Hardware
S1
- 2 1/2” Screws
x 4 total
Notch to front
and on top.
Pilot Hole
first.
Pilot Hole
first.
Notch to front
and on top.
Pilot Hole
first.
Sits flush with inside
of Wall framing.
22.
Attach
Long Door Header
to
Vertical Door Jambs and Narrow
Walls with
2 - 2 1/2” Screws
per
side. Position the notch on the top
facing the front as per
Step 21
.
Pre-drill to prevent splitting!
Parts
Door Header - Long
(2” x 3 3/8” x 78”)
x 1
Hardware
S1
- 2 1/2” Screws
x 4 total
Make sure joints are
tight. Push Walls in
if required.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 16