42.
Locate first row of
Roof Battens
. Starting
with an
Outside Batten
place on
Rafters
1/8” up
from
Rafter
end.
Batten
should rest on center of
double rafter. Pre-drill 1/8” pilot hole before attach-
ing. Attach with
2 - 1 1/4”
screws. Next place
Middle Batten
between double rafters and attach
with
2 - 1 1/4”
screws. Next attach 2nd
Outside
Batten
with
2 - 1 1/4”
screws.
Parts (Steps 42 - 46)
Roof Batten Outside
(3/4” x 3 1/2” x 49 1/4”)
x 16
Roof Batten Middle
(
3/4” x 3 1/2” x 45 1/2”
)
x 8
Batten Spacers
(3/4” x 1 1/2” x 14 1/8”)
x 12
Hardware (Steps 42 - 46)
S2
- 1 1/4” Screws
x40 total
D. Roof Section
Exploded view of all parts necessary to complete the Rafter Section. Identify all parts prior
to starting.
Batten Spacers (12)
3/4” x 1 1/2” x 14 1/8”
Metal Roof Panels (8)
61” long x 39” wide
Metal Ridge Caps (3)
60” long
Roof Batten Outside (16)
3/4” x 3 1/2” x 49 1/4”
Roof Batten Middle (8)
3/4” x 3 1/2” x 45 1/2”
Foam Enclosures
(Several Pcs)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 26