![OLT 8x12 SpaceMaker Assembly Manual Download Page 29](http://html.mh-extra.com/html/olt/8x12-spacemaker/8x12-spacemaker_assembly-manual_732310029.webp)
48.
One the Metal Roof is spaced correctly from side-to-side and top-to-bottom, lift 3 panels
up and run a bead of caulking down the overlapping seams of each panel to seal the joints.
Place panels down one by one once seam is caulked. You will likely need assistance from a
helper for this step. Caulk each seam.
Bead of caulking
49.
Using
8 - 2” Metal Screws
and
1/4” Nut Driver
(included), partially secure Metal Roof
Panels to 2nd row of battens from top. Only fasten screws halfway so that Metal Roof Hangers
can be removed. Metal screw is self-tapping, screw into center of Battens at peak of Roof
panels.
Important Metal Roof Hangers
will be removed in Step 50.
50.
Before fully securing roof panels, remove Metal Roof Hangers from Roof.
Important: Remove Metal Roof Hangers.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 29