
46 |
Page
Oliver Machinery
4265 Jointer
Adjust Belt Tension
CAUTION
Belt and pulleys may be hot after operations. Allow components to cool before
servicing.
1.
Disconnect jointer from power source!!
2.
Remove motor access panel and the belt
cover.
3.
Apply moderate pressure on the V-belt
midway between the two pulleys. Properly
tensioned V-belt should deflect by
approximately 1/4“.
4.
If V-belt tension needs to be adjusted,
loosen both lower motor mounting bolts
(#1). Lower the motor until proper belt
tension is reached. Secure the motor
mounting plate by tightening both upper
mounting bolts (#2), and the lower
mounting bolts.
5.
If V-belts need replacement, push the belt
towards the motor to walk the belt out from
the motor pulley.
If the belt is too tight to remove, temporarily
loosen the upper mounting bolts (#2). Raise
the motor to loosen the belt, and remove it
from the pulleys.
6.
Install a new belt and make sure the belts sit
into the grooves of pulleys.
7.
Adjust belt tension and re-secure motor as
needed.
8.
Replace belt cover and motor access panel
when maintenance completes.
Summary of Contents for 4265
Page 2: ......
Page 10: ...10 Page Oliver Machinery 4265 Jointer Identification...
Page 11: ...4265 Jointer OLIVERMACHINERY NET 11 Page...
Page 51: ...4265 Jointer OLIVERMACHINERY NET 51 Page Wiring Diagram For Stock 4265 101 4S 230V 1Ph...
Page 52: ...52 Page Oliver Machinery 4265 Jointer For Stock 4265 102 4S 230 460V 3Ph...
Page 53: ...4265 Jointer OLIVERMACHINERY NET 53 Page Parts List Fence Assembly...
Page 54: ...54 Page Oliver Machinery 4265 Jointer Table and Cutterhead Assembly...
Page 55: ...4265 Jointer OLIVERMACHINERY NET 55 Page Base Assembly...
Page 56: ...56 Page Oliver Machinery 4265 Jointer Motor and Cabinet...
Page 66: ...66 Page Oliver Machinery 4265 Jointer Maintenance Record Date Task Operator...
Page 67: ...4265 Jointer OLIVERMACHINERY NET 67 Page Notes...