
4265 Jointer
OLIVERMACHINERY.NET
21
|
Page
Assembly
This jointer is mostly assembled in the factory. There are a few more steps to complete before the machine
is ready for a test run:
1.
Setup control panel.
2.
Install battery for digital readout.
3.
Inspect / Adjust Jointer Tables (optional).
4.
Install cutterhead guard.
5.
Connect jointer to a dust collection system.
6.
Connect jointer to power source.
The approximate time for cleaning and assembly is approximately 60 minutes.
Setup Control Panel
1.
To prevent damages, the control panel is
lowered when it is shipped from the factory.
Please follow the instructions to setup the
control panel:
2.
Remove all six cap screws from control panel
post.
3.
Raise the control panel to its operational
position, then remount it back to the cabinet.
4.
Attach the last two cap screws through the
table adjustment handwheel bracket.
Install Batteries for Digital Readout
Locate the digital readout on the control panel. Remove the battery
cover and install 2 AA sized batteries.
Summary of Contents for 4265
Page 2: ......
Page 10: ...10 Page Oliver Machinery 4265 Jointer Identification...
Page 11: ...4265 Jointer OLIVERMACHINERY NET 11 Page...
Page 51: ...4265 Jointer OLIVERMACHINERY NET 51 Page Wiring Diagram For Stock 4265 101 4S 230V 1Ph...
Page 52: ...52 Page Oliver Machinery 4265 Jointer For Stock 4265 102 4S 230 460V 3Ph...
Page 53: ...4265 Jointer OLIVERMACHINERY NET 53 Page Parts List Fence Assembly...
Page 54: ...54 Page Oliver Machinery 4265 Jointer Table and Cutterhead Assembly...
Page 55: ...4265 Jointer OLIVERMACHINERY NET 55 Page Base Assembly...
Page 56: ...56 Page Oliver Machinery 4265 Jointer Motor and Cabinet...
Page 66: ...66 Page Oliver Machinery 4265 Jointer Maintenance Record Date Task Operator...
Page 67: ...4265 Jointer OLIVERMACHINERY NET 67 Page Notes...