1 6
Installation - Section 2
Connect the power cord supplied to the three pin connector located at the
rear of the Moisture Analyzer and to a power source. The Moisture
Analyzer becomes operational as soon as power is applied. The display
will remain off until the
On/Off
button is pressed.
WARNING:
If the power cable supplied is not long enough, use only a
3-pin exten-
sion cable with equipment grounding connector.
Allow the Moisture Analyzer to warm up for at least 30 minutes
to
enable it to adapt itself to the ambient conditions. If the Moisture Analyzer
has been stored in a very cold environment before installation, it may
require several hours for it to stabilize.
2.6 Switching the Moisture Analyzer on and off
Your Moisture Analyzer is on at all times when connected to a power source. The display can be turned on or
off.
To
switch the Moisture Analyzer on
, press the
On/Off
button. An internal
diagnostic test is performed; the display lights and the logo and product
name appears followed by the initial display.
To
switch the Moisture Analyzer off
, press the
On/Off
button. After the
analyzer has been switched off, it is in the standby mode. If you wish to
perform a test, press the
On/Off
button again.
As your Moisture Analyzer needs no warm-up time when in the standby
mode and is immediately ready for testing samples, we advise you to
switch the display off by use of the
On/Off
button and not to disconnect it
from the power supply. This also ensures that the Moisture Analyzer is
always in thermal equilibrium.
On/Off
CLEAR
PAN
PRESS
TARE
TEST ID:
-DEFAULT-
TEMP/TIME: 100C / 10:00
TARGET WT:
5 GRAMS
0.000
* GRAMS
All manuals and user guides at all-guides.com
all-guides.com