ADJUSTMENTS AND
MAINTENANCE
UT-MT-0812_2.0_24-01-2023 (EN)
Use and Maintenance Manual
LERA
36
4.6
Replacement of the power cable
Before carrying out any intervention on the device, cut off all external power sources and
place appropriate work-in-progress warnings on the systems.
Wait for the discharging time (at least 5 minutes) and check using appropriate instruments
that there are no residual energies before accessing the electrical equipment.
Unscrew the screws present on the fixture body until free the fixture from the anchorage.
Disconnect the electrical connections: disconnect the plug of the fixture from the socket coming from the transformer
and separate the ground cable with the protective conductor coming from the base.
Remove the fixture from the base and bring it to the workshop to remove the support and to complete maintenance.