GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
5 of
36
a.
Main Anchor Bolt Check List
A. Anchor Bolt Spacing
k.1)
Distance between Right Abutment Plate Face to Center of nearest anchor bolt
k.2)
Distance between left Abutment Plate Face to Center of nearest anchor bolt
B.
Straightness of Anchor Bolt Alignment
Left Abutment Plate
Right Abutment Plate
N1 = distance from face of right
abutment wall to centerline of first
main anchor bolt
N2 = distance from face of left
abutment wall to centerline of first
main anchor bolt
PER DRAWING:
Centerline of anchor bolts – drawn with taught
string line between two outer most anchor bolts
Distance of center of anchor
bolt most out of alignment
TOLERANCE +/- 1/16” (1.5mm)
MAIN ANCHOR BOLTS SHOULD NOT VARY MORE THAN 1.5mm FROM
NOMINAL SPACEING