GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
25 of
36
11.
After each hole has been drilled, pull back the abutment seal and
apply silicone around each stud in the same fashion as shown in
figure 14.
12.
Re-position the abutment seal with the holes over the studs; fasten
the abutment seal retainers down as shown in section D-D of
drawing 121.
13.
Torque all restraining strap nuts to the values shown in the anchor
torque specifications section below.
6b. EPDM Seal Installation at an Interpanel Seal
EPDM is to be used and the ends of all bladders to help ensure a
water tight seal between different components.
1.
Cut two holes towards the top edge of the EPDM to fit over two
anchor bolts. Check drawing 101 for spacing between anchors.
Figure 18: Description of step 1
2.
Have one or two workers pry the bladders up to expose the two