GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
7 of
36
Positioning of Blockouts
o.1)
Distance between Left abutment wall and centerline of first air assembly block out __
o.2)
Distance between CL first left air block out and CL of second air block out
_ _ ___
p.1)
Distance between Right abutment wall and centerline of first air assembly block out
__
p.2)
Distance between CL first right air block out and CL of second air block out
__
q.1)
Distance between Left abutment wall and centerline of first restraining strap block out _
q.2)
Distance between CL first left restraining strap block out and CL of second restraining strap
block out _______
r.1)
Distance between Right abutment was and centerline of first restraining strap block out ___
r.2)
Distance between CL first right restraining strap block out and CL of second restraining strap
block out _______
After completion of checklist, notify OHI of any tolerance issues that
exist so that a proper plan of action can be created.
Distance between Left
abutment wall and
centerline of first air
assembly block out
Distance between
centerline of first air
block out and center of
second air block out