GATE SYSTEM INSTALLATION PROCEDURE
Printed:
10/23/2019
15-1507
OHI
OBERMEYER Hydro Inc.
11 of
36
3.
Assure that the embedded pipe ends with a ½” or 12mm stainless
steel hose barb. Install one at this time if necessary. Use thread
sealant on all threads
THREAD SEALANT
THREAD
TOGETHER
TIGHTLY
THREAD INTO
BLADDER
FITTING
TIGHTLY
TRY TO END
WITH HOSE
BARB POINTING
DOWNSTREAM
Figure 4: Description of steps 1 and 2 of air fitting installation