Maintaining and Servicing the NVIDIA DGX Station
DGX Station
DU-08255-001 _v4.6 | 48
b). Firmly push the panel back into place to re-engage the latch.
6. Reconnect the network and power cables and power on the DGX Station.
The DGX Station stops at its power-on self-test (POST) and then shuts down.
7. After the DGX Station shuts down, power it on again.
When powered on a second time, the DGX Station starts up normally.
8. If necessary, set the system date and system time to the current time and date.
a). At the first NVIDIA screen to appear while the system is rebooting, press
F2
to access
the
UEFI BIOS Utility - EZ Mode
screen.
b). Click the date and time displayed in the top left corner of the
UEFI BIOS Utility - EZ
Mode
screen.
Summary of Contents for DGX Station
Page 1: ...DU 08255 001 _v4 6 July 2020 DGX Station User Guide ...
Page 6: ...About this Guide DGX Station DU 08255 001 _v4 6 vi ...
Page 83: ...Maintaining and Servicing the NVIDIA DGX Station DGX Station DU 08255 001 _v4 6 77 ...
Page 92: ...Connections Controls and Indicators DGX Station DU 08255 001 _v4 6 86 ...
Page 95: ...Compliance DGX Station DU 08255 001 _v4 6 89 C 6 China RoHS Material Content ...
Page 99: ...Compliance DGX Station DU 08255 001 _v4 6 93 C 13 South Korea KC C 14 Taiwan BSMI ...