Maintaining and Servicing the NVIDIA DGX Station
DGX Station
DU-08255-001 _v4.6 | 39
2. Roll the DGX Station up the ramp into the bottom tray of its shipping carton.
CAUTION:
Ensure that you have a second person to help you roll the DGX Station into
position.
3. Insert the front packing piece into the tray, ensuring that the lip of the packing piece is
under the DGX Station.
4. Insert the side packing pieces into the tray, ensuring that the lip of each piece is under the
DGX Station.
5. Pack all supplied accessories in the accessory boxes
except
the AC power cable.
Summary of Contents for DGX Station
Page 1: ...DU 08255 001 _v4 6 July 2020 DGX Station User Guide ...
Page 6: ...About this Guide DGX Station DU 08255 001 _v4 6 vi ...
Page 83: ...Maintaining and Servicing the NVIDIA DGX Station DGX Station DU 08255 001 _v4 6 77 ...
Page 92: ...Connections Controls and Indicators DGX Station DU 08255 001 _v4 6 86 ...
Page 95: ...Compliance DGX Station DU 08255 001 _v4 6 89 C 6 China RoHS Material Content ...
Page 99: ...Compliance DGX Station DU 08255 001 _v4 6 93 C 13 South Korea KC C 14 Taiwan BSMI ...