- 28 -
INSTALLATION INSTRUCTIONS
G015
For NPK 2000 ft. lb. class hammers
(with top brackets that include joint fittings).
e. Install hose line (a63). Route hose from pressure side joint fitting (m18a),
through top bracket burnout, to port labeled “P
OIL
” on the grease pump (FZ).
5.2.
For units with NPT style joint fittings.
a. Disconnect the hammer hoses (m5 and m6) from the NPT elbows (m37a
and m37b). Remove the elbows from the joint fittings and discard.
b. Install straight fittings (g19) into the special elbows (a88).