Retain these installation, operating and maintenance instructions for the full duration of the operator
’
s service life!
GB
Retain these installation, operating and maintenance instructions for the full duration of the operator
’
s service life!
GB
Proofofinspectionandmaintenanceofthedoorsystem
Date
W
ork performed / necessary measures
Initial operation, first testing
Test carried out
Signature / address
of the company
Defects rectified
Signature / address
of the company
Declaration
for the installation of an incomplete machine
in accordance with the Machinery Directive 206/42/EC, annex II part 1B
hereby declares that the garage door operator
complies
with
the
Machinery
Directive
2006/42/EC
and
is
intended
for
installing
into
a
door
system.
The following basic safety requirements in accordance with annex I hereto were applied
General principles no. 1
1.2.1 Safety and reliability of control systems:
Integrated force limit:
kat. 2 / PL
C
Input ST
OP
A:
kat. 2 / PL
C
Input ST
OP
B:
kat. 2 / PL
C
In doing so, the harmonized standards EN13849-1 were applied.
The
technical
documents
in
accordance
with
annex
VII
B
were
drawn
up.
Conformity
is
in
accordance
with
the
provisions
of
the
EC
Construction
Products
Directive
89/106/EC.
For
the
part
"Operating
Forces"
the
corresponding
initial
tests
in
cooperation
with
the
recognized
testing
bodies
were
performed.
In
doing
so,
the
harmonized
standards
EN13241,
EN12453
and
EN12445
were
applied.
Conformity
is
in
accordance
with
the
Low-voltage
Directive
2006/95/EC
Conformity is in accordance with the EMC Directive 2004/108/EC
T
he
product
may
not
be
put
into
service
until
it
has
been
established
that
the
door
system
complies
with
the
provisions
of
the
Machinery
Directive.
Head
of
Development
NovofermtormaticGmbH
Oberste-W
ilms-Str
.15a
D-44309Dortmund
Novomatic200,423,563S,803S
•
:
-
-
•
•
•
•
Dortmund,
2015-02-25
Ulrich
Theile
DeclarationofConformityandInstallation