Checklist for the Door System
(Document equipment present at time of initial operation by ticking off)
1.0 Door
Characteristics to be tested
present
missing
1.1 smooth running of the door
(all positions)
1.2 fastenings / connections
(condition / seating)
1.3 pivots / joints
(condition / lubrication)
1.4 track rollers
(condition / lubrication)
1.5 sealings /
(condition / seating)
1.6 door frame / door guidance
(alignment / fastening / condition)
1.7 door leaf
(alignment / condition)
1.8 locking / lock
(condition / function / lubrication)
1.9 wicket door
(function / door closing)
2.0 Weigth compensation
2.1 wire ropes
(condition / seating)
2.2 rope fastening
(condition / seating)
2.3 2 safety coils on rope drum
(condition)
2.4 safety barrier
(condition)
2.5 rotations T-wave
(condition)
2.6 springs
(condition / seating / tension)
2.7 safety elements
(condition / seating)
(spline, spring cotters etc.)
3.0 Operator / control unit
3.1 operator / console
(condition / fastening)
3.2 electrical cabling / connections
(condition / seating)
3.3 force transferring means
(condition / lubrication)
3.4 rapid / emergency unlocking
(condition / function)
3.5 wicket door contact
(condition / function)
3.6 touch pad / hand transmitter
(condition / function)
3.7 limit stop
(condition / function)
3.8 additional safety installations
(condition / function)
5.0 Crush and shearing protection
5.1 secondary closing edges
(condition / function)
5.2 force limit
(function according to EN 12453)
5.3 light barriers
(condition / function)
6.0 Documentation
6.1 data plate / CE marking
(complete / legible)
6.2 Declaration of Conformity
(complete / legible)
of the door system
6.3 data plate
(complete / legible)
6.4 inspection log book
(present / legible)
6.5 Installation, Operating, Maintenance/
(complete / legible)
Instructions
Retain these installation, operating and maintenance instructions for the full duration of the operator’s service life!