
3 - INSTALLATION
3-37
12. Assemble the Front Wheel Carrier Arm’s
2
to the Front
Carrier Wheel Arm
1
, and secure using the 3/8-16 Hex
Bolts
3
, 3/8” Flat Washer
4
, and a 3/8”-16 Nylock Nuts
5
. Do not tighten the 3/8”-16 Nylock Nuts
5
at this
time.
3
3
2
1
4
5
4
3
5
3
5
2
4
4
5
Fig. # 3-91 Assemble Carrier Wheel Arm To Carrier Wheel
Mount Plate
13. Next, support the sweep assembly with wood blocks to
get the dimension of 1.00”
1.00”
Fig. # 3-92 Set Distance From Outer Diameter of Sweep
Auger to Bin Floor
14. Now, lower the Front Wheel Carrier Arm’s
1
to the floor
and tighten the 3/8”-16 Nylock Nuts
2
1
2
2
1
2
2
Fig. # 3-93 Lower the Front Wheel Carrier Arms to the Floor
and Tighten the Nuts
15. If you have a concrete grain bin floor, then you will not
need to install the Parking Load Plates. If you have a
corrugated metal grain bin floor, then proceed to the next
step.
16. Center the Parking load plates
1
under the Front Wheel
Carrier Arm’s, and secure with the 1/4”-14 X 1” Self Drill
-
ing Hex Head Screws
2
.
2
1
2
2
2
2
1
2
Fig. # 3-94 Install Screws To Secure Parking Load Plates
Summary of Contents for The Grain Handler 10
Page 12: ...1 6 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Page 40: ...2 SAFETY INFORMATION 2 28 This Page Is Intentionally Left Blank...
Page 90: ...4 WORKING OPERATIONS 4 12 This Page Is Intentionally Left Blank...
Page 108: ...5 MAINTENANCE 5 18 This Page Is Intentionally Left Blank...
Page 112: ...6 TROUBLESHOOTING 6 4 This Page Is Intentionally Left Blank...
Page 120: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Page 128: ...i 6 www norwoodsales com 1 800 446 0316...
Page 129: ......