
3 - INSTALLATION
3-7
14. Norwood Sales Inc. recommends raising the
"Center
Hopper Sump"
16
1.0" higher than the disharge end by
shimming the
"Support Mounting Brackets"
12
. Make
sure that there is a 1.0" decline in the tube towards the
discharge end to allow for drainage.
1.00"
12
16
12
12
Fig. # 3-14 U-Trough Tube Installation
15. You also can keep the
"U-Trough Tube"
7
level for your
installation. There are (Qty. 2)
"1/8" Diameter Holes"
19
in the
"Center Hopper Sump"
16
area bottom to
allow for drainage.
19
16
7
Fig. # 3-15 U-Trough Tube Installation
16. Shim the
"Support Mounting Brackets"
12
as neces-
sary to achieve firm mounting to the
"Concrete Founda-
tion" 17
. Use a
"Concrete Anchor"
21
or equivalent,
"Large Washers" 20
or some type of shim stock.
20
17
21
12
Fig. # 3-16 U-Trough Tube Installation
17. Check the
"Hopper Gate Control Rods" 13
to be certain
that they were not bent in shipping or handling. This could
cause difficulty in opening the
"Center Hopper Gate" 14
and or
"Intermediate Hopper Gate(s)" 15
. Straighten
if necessary with a pry bar.
13
15
15
14
13
Fig. # 3-17 Check the "Hopper Gate Control Rods"
Summary of Contents for The Grain Handler 10
Page 12: ...1 6 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Page 40: ...2 SAFETY INFORMATION 2 28 This Page Is Intentionally Left Blank...
Page 90: ...4 WORKING OPERATIONS 4 12 This Page Is Intentionally Left Blank...
Page 108: ...5 MAINTENANCE 5 18 This Page Is Intentionally Left Blank...
Page 112: ...6 TROUBLESHOOTING 6 4 This Page Is Intentionally Left Blank...
Page 120: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Page 128: ...i 6 www norwoodsales com 1 800 446 0316...
Page 129: ......