3 - INSTALLATION
3-19
6. Connect the
"Horizontal Powerhead Output Shaft" 44
to the input shaft of the
"U-Trough Unloading Auger
Flighting"
42
with the
(Qty. 2) "1/2-13 X 3 Bolts" 45
,
&
"1/2-13 Nuts"
46
.
45
46
46
42
45
Fig. # 3-42 Horizontal Powerhead Installation Step # 6
7. Next, push the
"Horizontal Powerhead" 43
with the
connected
"U-Trough Unloading Auger Flighting"
42
back into the
"U-Trough" 2
. Rotate the powerhead
slightly left to right so that the end of the auger flighting
splines meshes with the gearbox spline.
2
42
43
Fig. # 3-43 Horizontal Powerhead Installation Step # 7
8. When properly set, the end of the
"U-Trough Unloading
Auger Flighting"
42
should be approximately 1.00" from
the
"Splined Gearbox Input Shaft" 55
Fig. # 3-44 Horizontal Powerhead Installation Step # 8
55
1.00"
42
9. Secure the
"Horizontal Powerhead" 43
to the
"U-Trough" 2
with the
(Qty. 4) "1/2-13 X 1 Bolts" 3
, &
"1/2-13 Nuts"
4
Fig. # 3-45 Horizontal Powerhead Installation Step # 9
2
4
3
43
10. Install the
"Powerhead Guard Assembly"
47
with the
Summary of Contents for The Grain Handler 10
Page 12: ...1 6 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Page 40: ...2 SAFETY INFORMATION 2 28 This Page Is Intentionally Left Blank...
Page 90: ...4 WORKING OPERATIONS 4 12 This Page Is Intentionally Left Blank...
Page 108: ...5 MAINTENANCE 5 18 This Page Is Intentionally Left Blank...
Page 112: ...6 TROUBLESHOOTING 6 4 This Page Is Intentionally Left Blank...
Page 120: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Page 128: ...i 6 www norwoodsales com 1 800 446 0316...
Page 129: ......