
3 - INSTALLATION
3-8
18. Install the Drying / Aeration floor to the manufacturer's
specifications.
19. Seal the areas in the
"Grain Bin Floor" 24
that was cut
to fit around the hoppers with the
"Hopper Flanges" 22
.
Use
"Self-Drilling Screws" 23
to attach the flanges to
the
"Grain Bin Floor" 24
23
24
22
22
Fig. # 3-18 Install Hopper Flanges
20. Caulk any cracks or openings with a good quality silicone
Fig. # 3-19 Caulk Around Hopper Flanges
21. Install the
"Lower Bin Wall Plate" 25
to seal the
"U-Trough Tube"
7
and opening that was cut in the
grain bin wall. Attach with carriage bolts or screws. The
"Upper Bin Wall Plate" 26
overlaps the
"Lower Bin
Wall Plate" 25
by 1/2" to allow for proper watershed.
25
1/2"
7
26
Fig. # 3-20 Install Bin Wall Plates
22. Caulk any cracks or openings and fill cavities in corruga
-
tions with a good quality silicone or butyl based sealant.
Fill Cavities
In Corrugations
Fig. # 3-21 Caulk Around Bin Wall Plates
Summary of Contents for The Grain Handler 10
Page 12: ...1 6 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Page 40: ...2 SAFETY INFORMATION 2 28 This Page Is Intentionally Left Blank...
Page 90: ...4 WORKING OPERATIONS 4 12 This Page Is Intentionally Left Blank...
Page 108: ...5 MAINTENANCE 5 18 This Page Is Intentionally Left Blank...
Page 112: ...6 TROUBLESHOOTING 6 4 This Page Is Intentionally Left Blank...
Page 120: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Page 128: ...i 6 www norwoodsales com 1 800 446 0316...
Page 129: ......